Saturday, May 19, 2012

May 18th and 19th

OK, so I forgot to make a blog entry yesterday and I worked Saturday so here is a combined entry.
Friday was a fairly light day. Finished removing and installing the hydraulic hard line on the 955 tractor. Then was given a 3038E that another tech had been working on and I had to finish. The other tech had started installing a grapple on the bucket and was all done except for the hydraulic lines from the power beyond valves that were added. I made two hydraulic lines 13 feet long to route from the back of the tractor to the front of the loader. Mounted the quick couplings on the loader and then connected the grapple lines to them. Started the tractor and found the lines to the grapple were too short so I had to make longer lines for the grapple.
Saturday was strictly an overtime day. I worked on lawn and garden items. Installed a bagger on a X300 and ran a drill bit into the meaty portion next to bottom of my thumbnail. Put a band aid on it and continued the install. Then it was a tune up on a walk behind push mower and putting brake pads on a LX172. With those completed I brought in another X300 to replace the blades  and do a tune up. And that completed an overtime day.

No comments:

Post a Comment