Tuesday, April 24, 2012
April 24th
It will take one more day to complete this project. It seems that every time I think I am getting close to being done another lengthy step pops up. Today's long step was getting all of the seed tubes in place. It is amazing how long it takes to position and connect 48 seed tubes. Attached the draw bar today and routed all of the hydraulic lines and electrical connections. It takes seven hydraulic lines and four electrical cables to operate this thing. Started working on the commodity cart draw bar and all of its connections. I believe that tomorrow it will definitely be completed. Still have to plumb all of the commodity cart seed delivery tubes to the interface panel in the air seed drill, finish the cart draw bar connection, tidy all of the wiring up, investigate and repair wheel bearing issues with one wheel set, grease everything up and test everything. It could be a full and busy day.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment